某水库工程施工期防洪度汛方案及工程措施 被引量:1

Flood Control Scheme and Engineering Measures during Construction Period of a Reservoir Project
下载PDF
导出
摘要 该文简述了某水库工程施工期采用的一种简易、临时的防洪度汛方案,方案针对工程形象进度、结合实际情况,寻找泄洪排水通道,根据施工条件和强度,分时段确定筑坝高度、防洪水位,和对应的工程措施并在短时间内完工,保证了大坝施工区的安全度汛。 The paper briefly introduces a simple and temporary scheme of flood control in the construction period of a reservoir project.According to the visual progress of the project and combined with the actual situation,the scheme looks for the flood discharge channel.The dam height,flood prevention level and corresponding engineering measures are determined by time according to the construction conditions and intensity.The engineering measures are completed in a short time to ensure the safety of flood control in the dam construction area.
作者 章慧倩 段立早 Zhang Huiqian;Dun Lizao(Kunming Water Conservancy Society,Kunming 650000,China)
机构地区 昆明市水利学会
出处 《有色金属设计》 2019年第4期35-42,共8页 Nonferrous Metals Design
关键词 施工期 防洪度汛 方案 工程措施 Construction period Flood control Scheme Engineering measures
  • 相关文献

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部