摘要 出于增加经济性和运行灵活性的考虑,核电站一般要求具备延伸运行能力.延伸运行通常在堆芯寿期末进行,硼浓度过低不能再稀释引入反应性,仅依靠降低冷却剂温度或者堆芯功率来延长运行的运行模式.目前国内仅少数核电厂实施过延伸运行,缺乏对不同延伸运行方式的分析研究,另外大型三代压水堆的延伸运行能力有待研究.基于我国大型三代压水堆华龙一号堆型,本文从堆芯物理角度,首次分析了不同延伸运行方式的实现过程,并讨论了不同延伸运行方式的经济性及安全评价的影响. Strech out operation usually arises from a change in energy requirements or a change in planned shutdown date.Usually it happens in the end of cycle when the boron concentration is too low to induce reactivity.Several methods of cycle extension are possible,including power coastdown,temperature coastdown,and varying combinations of these.Few nuclear powered plants have operated with stretch out operation in China,research or demonstration should be done for different kinds of operations especially for the large-scale nuclear powered plants.This paper for the first time researches the coastdown operation capability of HPR1000 from the view of core physics.The results show the performances of power coastdown,temperature coastdown,and varying combinations of these of HPR1000.Economy and safety for different kinds of operations are also discussed in this paper.
出处 《科技创新导报》 2020年第2期28-31,33,共5页 Science and Technology Innovation Herald
关键词 华龙一号 三代压水堆型 延伸运行 HPR1000 Generation Ⅲ pressurized reactor Stretch out operation
  • 相关文献

参考文献3

二级参考文献2

共引文献23

同被引文献13

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部