摘要
本文通过简述在某高桩梁板结构式码头工程建设过程中,通过在各主要分项工程运用典型施工法(首建制),以策划、实施、总结、改善的整个过程提升工程实体质量水平的案例,供其他类似码头建设质量控制管理中予以参考借鉴。
In this paper,by briefly describing the construction process of a high-pile beam-slab structure wharf project,by applying typical construction methods(first construction system)in each major subproject,the entire process of planning,implementation,summary,and improvement is used to improve the quality of the project entity.Cases for reference,for reference in quality control management of other similar terminal construction.
出处
《科技视界》
2020年第8期131-132,共2页
Science & Technology Vision
关键词
码头工程
典型施工法
质量控制
运用
Terminal engineering
Typical construction method
Quality control
Application