1Fangqin Tang, Aizhu Ren. GIS-based 3D evacuation simulation for indor fire [ J ]. Building and Environment, 2012 ( 49 ) : 193 -202.
2UweR-ppel, Kristian Schatz. Designing a BIM-based serious game for fire safety evacuation simulations [J]. Advanced Engineering Informatics, 2011 ( 25 ) :600-611.
3Waly Ahmed F, Thabet Walid Y. A virtual construction environment for preconstruction planning [ J ]. Automation in Construction, 2002 ( 12 ) : 139-I54.
4Sacksl R, Treckmann M, Rozenfeld O, et al. Visualization of work flow to support lean construction [ J ]. Journal of Construction Engineering and Management, 2009 ( 12 ) :1307-1315.
5Bansal V K. Application of geographic information systems in construction safety planning [ J ]. International Journal of Project Management, 2011 ( 29 ) :66-77.
6Peterson Forest, Hartmann Timo, Fruehter Renate, et al. Teaching construction project management with BIM support: experience and lessons learned[J]. Automation in Construction, 2011 (20) :115-125.
7Ho Chunling, Dzeng Renjye. Construction safety training via e- learning: learning effectiveness and usersatisfaction [ J ]. Computers & Education, 2010 (55) : 858-867.
8Hu Wenfa, He Xinhua, Kang Julian. Integration of radio- frequency identification and 4D CAD in construction management [ J ]. Tsinghua Science and Technology, 2008,13 ( 1 ) : 151-157.
9Yang Huanjia, Chew David A S, Wu Weiwei, et al. Design and implementation of an identification system in construction site safety for proactive accident prevention [ J ]. Accident Analysis and Prevention, 2011 ( 8 ) : 193-203.
10Chae Soungho, Yoshida Tomohiro. Application of RFID technology to prevention of collision accident with heavy equipment [ J ]. Automation in Construction, 2010 ( 19 ) : 368-374.