摘要 随着社会的进步和科学技术的发展,地铁的相关建造技术也取得了突破性的进展。我国目前用到的临时钢管柱桩定位控制装置便是技术改革与进步的代表。尤其在采用盖挖法施工的地铁车站,临时钢管柱桩施工的定位装置有了较大的改进,在建造的过程中主要用到钢板、双拼工字钢、枕木、钢板吊具、吊筋、挡块等原材料,是目前进行地铁修建过程中比较常用的一种先进的技术手段,其技术进步大大提高了建设工程的质量与效率。本文就临时钢管柱桩定位控制技术进行论述。 With the progress of society,the development of science and technology has made breakthrough in the subway construction technology.The temporary steel pipe pile positioning control device is the representative of technical reform and progress.Especially in the construction of temporary steel pipe pile in subway station with cover excavation method,the positioning device has been greatly improved.In the process of construction,the main materials are steel plate,double I-beam,sleepers,steel plate hoist,hoisting bars,block and other raw materials.It is a kind of advanced technical means commonly used in the process of subway construction at present,and its technological progress has greatly improved the quality and efficiency of the construction.This paper discusses the positioning control technology of the temporary steel pipe post.
作者 张立成 Zhang Licheng(The 2nd Engineering Co.,Ltd.of China Railway 10th Bureau Group,Zhengzhou Henan 450003,China)
出处 《城市建筑》 2020年第6期154-155,共2页 Urbanism and Architecture
关键词 钢管桩 定位控制 控制内容 技术应用 steel pipe pile positioning control control content technology application
  • 相关文献

参考文献2

二级参考文献7

共引文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部