南浦溪特大桥钢管拱混凝土泵送顶升施工关键技术 被引量:3

The Key Technology of Pumping and Jacking of Concrete Tubular Arch of Nanpuxi Bridge
下载PDF
导出
摘要 结合浙江文泰高速公路南浦溪特大桥钢管拱混凝土泵送顶升施工实际情况,介绍拱桥钢管混凝土配合比设计、顶升工艺设计、施工情况及紧急情况处理等经验,为同类工程提供借鉴。 Based on the actual construction situation of pumping and jacking of concrete filled steel tube at Nanpuxi Bridge of Wentai expressway in Zhejiang,this paper introduces the experience of mixing ratio design,jacking process design,construction and emergency treatment of concrete filled steel tube for arch bridge,which provides a reference for similar projects.
作者 杨忠波 Yang Zhongbo(China Railway ERJU 5th Engineering Co.,Ltd.,Chengdu Sichuan 610091,China)Abstract:Based on the actual construction situation of pumping and jacking of concrete filled steel tube at Nanpuxi)
出处 《城市建筑》 2020年第5期170-172,194,共4页 Urbanism and Architecture
关键词 钢管拱 混凝土 泵送顶升 steel tube arch concrete pumping and jacking
  • 相关文献

参考文献1

二级参考文献2

共引文献2

同被引文献13

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部