摘要
本文将玉溪煤矿中央辅助运输大巷出现的大变形破坏问题作为研究对象,分析了大巷变形破坏特征及导致大巷出现大变形破坏的主要原因,返修支护设计采用“锚网索+U型钢环形支架+关键位置注浆”复合支护方案,整体取得了较好的效果。
In this paper,the problem of large deformation and failure in the central auxiliary transportation roadway of Yuxi Coal Mine is taken as the research object,the characteristics of the deformation and failure of the main roadway and the main causes of the deformation and failure of the main roadway are analyze.The repair support design adopts the"Anchor Mesh Cable+U-shaped steel ring support+grouting at the key position"composite support scheme,which has achieved good results as a whole.
作者
祁阿成
Qi A-cheng(Shanxi Lanhua Kechuang Yuxi Coal Mine Co.,Ltd.,Shanxi Qinshui 048214)
出处
《山东煤炭科技》
2020年第4期42-44,共3页
Shandong Coal Science and Technology
关键词
巷道
维修
支护
方案
roadway
repair
support
scheme