11210高水充填工作面作为孤岛工作面,末采阶段顶板压力大。采用锚网支护控制工作面顶板,撤架时利用掩护架保证撤架空间安全,利用移架平台撤出剩余支架,实现了安全生产。
The 11210 high water filling face is an island face,and the roof pressure is high in the last mining stage.The roof of the working face is controlled by anchor net support.When removing the frame,the cover frame is used to ensure the safety of the space for removing the frame,and the rest of the frame is removed by using the platform for removing the frame,so as to realize the safety production.
作者
周艳青
Zhou Yan-qing(Jizhong Energy Co.,Ltd.,Xingdong Mine,Hebei Xingtai 054001)
出处
《山东煤炭科技》
2020年第4期67-69,共3页
Shandong Coal Science and Technology
关键词
综采
支架
回撤
加固
fully mechanized mining
support
withdrawal