摘要 为了提高ZY6400型液压支架支护强度,采用有限元分析计算方法对支架掩护梁受力分布规律和疲劳寿命进行了模拟研究,并提出了优化措施。优化后的液压支架在1-101工作面进行了工业性实践,在试验期间支架掩护梁结构完好,支护强度高,安全性好,确保了矿井安全生产。 In order to improve the support strength of ZY6400 hydraulic support, the stress distribution and fatigue life of support shield beam were simulated by finite element analysis method, and the optimization measures were put forward. The optimized hydraulic support has been put into industrial practice in 10-101 working face. During the test, the shield beam of the support has good structure, high support strength and good safety, which ensures the safety of mine production.
作者 边志雄 BIAN Zhixiong(Hongdong Yilong Coal Industry Co.,Ltd.,Huozhou Coal and Electricity Group,Hongdong 041699,China)
出处 《煤矿现代化》 2020年第3期142-144,共3页 Coal Mine Modernization
关键词 液压支架 数值模拟 疲劳寿命 掩护梁 Hydraulic support numerical simulation fatigue life shield beam
  • 相关文献

参考文献3

二级参考文献12

  • 1王国强.实用工程数值模拟技术及其在ANSYS上的实践[M].西安:西北工业大学出版社,2001..
  • 2Klishin V I,Tarasik T M. Stand tests of hydraulic supports with respect to dynamic loads[J].Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh,2001,(01):84-91.
  • 3寇子明.液压支架动态特性分析与检测[M]{H}北京:冶金工业出版社,1996.
  • 4Bae S. Exchange biased and closed-flux pseudo spin-valve materials device applications and electrical reliability[D].Minneapolis:University of Minnesota,2003.
  • 5Pan J,Nicholas T. Effects of mean stresses on multi-axial fatigue life prediction based on fracture mechanics[J].{H}International Journal of Fatigue,2001,(01):87-92.
  • 6Klemenc J,Fajdiga M. Improved modeling of the loading spectra using a mixture model approach[J].{H}International Journal of Fatigue,2008,(07):1298-1313.
  • 7Xiong J J,Shenoi R A. A load history generation approach for full-scale accelerated fatigue tests[J].{H}Engineering Fracture Mechanics,2008,(1 0):3226-3243.
  • 8吴波;黎明发.使用Monte Carlo方法间接确定不可测机械零件载荷谱[J]{H}武汉工学院学报,1986(03):78-86.
  • 9Borczok T M. Design and operation of powered supports for longwall mining[J].Engineering & Mining Journal,1993,(06):194-196.
  • 10Dasgupta K,Karmakar R. Dynamic analysis of pilot operated pressure relief valve[J].{H}SIMULATION MODELLING PRACTICE AND THEORY,2002,(01):35-49.

共引文献32

同被引文献25

引证文献2

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部