摘要
大同煤矿集团大斗沟煤业有限公司综采一队针对8201工作面在前期回采过程中机械设备存在的问题,对设备采取相应的优化改进措施,通过实际应用效果发现,优化改进后大大提高了综采工作面机械设备运行效率,降低了设备故障率,提高了设备安全性能,保证了综采工作面安全高效生产,取得了显著的应用成效。
The fully-mechanized mining team of Dadougou Coal Industry Co.,Ltd.of Datong Coal Mine Group,aiming at the problems of the main problems of the mechanical equipment during the early stage of mining in the 8201 working face,shall take corresponding optimization measures to the equipment,and find out the actual application effect.The optimization and improvement greatly improves the operation efficiency of the mechanical equipment,reduces the failure rate of the equipment,improves the safety performance of the equipment,ensures the safe and high-efficiency production of the fully-mechanized mining face,and has achieved remarkable application effect.
作者
李世伟
Li Shiwei(Dadougou Coal Industry Co.,Ltd.Datong Coal Mine Group,Datong Shanxi 037003)
出处
《机械管理开发》
2020年第1期130-131,共2页
Mechanical Management and Development
关键词
机械设备
问题分析
优化改进
mechanical equipment
problem analysis
optimization and improvement