摘要
针对煤矿机电设备的安装要求,结合具体机型对矿井通风机与提升机设备的安装与调试过程进行了分析与研究,并分别针对两种设备提出了调试方法。该方案可满足现代设备的安装需求,可为煤矿机电设备的安装与调试工作提供参考。
According to the requirements of the installation of the electromechanical equipment in the coal mine,the installation and debugging process of the mine ventilator and the hoist equipment is analyzed and studied in combination with the specific model,and the debugging method is put forward for the two equipment.The scheme can meet the installation requirements of modern equipment,and provide a scheme for the installation and debugging of the electromechanical equipment of the coal mine.
作者
闫红燕
Yan Hongyan(Yanzishan Coal Mine of Datong Coal Mine Group,Datong Shanxi 037003)
出处
《机械管理开发》
2020年第1期248-249,共2页
Mechanical Management and Development
关键词
煤矿机电
通风机
提升机
coal mine electromechanical
ventilator
hoist