摘要
研究了连采机在大采高工作面掘进作业中的应用,在合理配套连采机掘进设备的基础上,分析了影响连采机快速掘进的因素,提出了一系列促进大采高工作面连采机快速掘进的措施,通过应用这些措施,进一步提高大采高工作面连采机掘进效率,保障工作面采掘工作的顺利进行.
The application of continuous mining machine in large mining face driving operation is studied.On the basis of reasonable matching equipment,the factors affecting the rapid driving of continuous mining machine are analyzed,and a series of measures are put forward to promote the rapid driving of continuous mining machine in large mining face.
作者
李小辉
Li Xiaohui(Sihe Coal Mine of Shanxi Jincheng Coal Mine Group,Jincheng Shanxi 048205)
出处
《机械管理开发》
2020年第4期164-165,共2页
Mechanical Management and Development
关键词
连采机
快速掘进
制约因素
措施
平行作业
continuous mining machine
rapid tunneling
constraints
measures
parallel operation