摘要 为了降低煤矿电机车故障率,保证煤矿辅助运输安全,大同煤矿集团四矿运输二区通过技术研究,对矿用架线式电机车结构组成、工作原理进行分析,同时对电机车在使用过程中常见故障进行剖析,并根据实际生产情况,采取了合理有效的措施.通过实际应用发现,采取措施后电机车故障率降低至4%以下,全年可降低电机车维修费用达54万元,取得了显著的安全和经济效益. In order to reduce the failure rate of electric locomotives in coal mine and ensure the safety of auxiliary transportation in coal mine, the structure and working principle of electric locomotives with overhead lines are analyzed through technical research, and the common faults in the process of electric locomotives are analyzed, and reasonable and effective measures are taken according to the actual production situation. Through practical application, it is found that the failure rate of electric locomotive is reduced to less than 4% after taking measures, and the maintenance cost of electric locomotive can be reduced to 540000 yuan in the whole year, which has achieved remarkable safety and economic benefits.
作者 姬胜国 Ji Shengguo(No.4 Coal Mine of Datong Coal Mine Group,Datong Shanxi 037003)
出处 《机械管理开发》 2020年第4期255-256,共2页 Mechanical Management and Development
关键词 矿用 架线式 电机车 结构原理 故障分析 处理措施 mine wire-frame electric locomotive structure principle fault analysis treatment measures
  • 相关文献

参考文献5

二级参考文献8

共引文献13

同被引文献31

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部