期刊文献+

电网甩负荷判断装置的实现方法 被引量:1

Realization Method of a Judging Device for Load Rejection of Power Grid
下载PDF
导出
摘要 详细介绍了一种电网甩负荷判断装置的实现方法,即在机组并网状态下,通过分析发电机定子电流和频率的变化量,快速准确地判断电网甩负荷工况,并开出信号控制调速器迅速关闭导叶到空载开度以下,切换运行方式到频率模式,避免水轮发电机组在电网甩负荷时过速停机情况的发生。 The realization method of a judging device for power grid load rejection is introduced. The method can quickly and accurately determine grid load rejection condition by analyzing the changes of generator stator current and frequency when the hydro-generator is connected to the grid. Under the condition of grid load rejection, the judging device will send signal to governor which closes guide vanes opening to the no-load position quickly, the signal also transmit to protection device which alter the unit operation mode to frequency simultaneously, that can avoid the unit shutdown due to grid load rejection.
作者 张鹏 尚明宏 赵先元 ZHANG Peng;SHANG Minghong;ZHAO Xianyuan(China International Water&Electric Corp.,Beijing 100120,China)
出处 《水力发电》 北大核心 2020年第5期105-109,共5页 Water Power
关键词 甩负荷 调速器 空载开度 过速 水轮发电机 load rejection governor no-load opening over-speed hydro-generator
  • 相关文献

参考文献4

二级参考文献13

  • 1.GB/T 9652.1-1997.水轮机调速器与油压装置技术条件[S].,1997..
  • 2王维俭.电气主设备继电保护原理与应用[M].北京:中国电力出版社,2001.
  • 3国家电力公司.国电发[20001589号防止电力生产重大事故的二十五项重点要求[M].北京:中国电力出版社,2005.
  • 4戎月莉,计算机模糊控制原理及应用,1995年,10页
  • 5常近时,水力机械过渡过程,1991年,102页
  • 6张振良,应用模糊数学,1991年,87页
  • 7王彩华,模糊论方法学,1988年,41页
  • 8常兆堂,水电站动力装置中的过渡过程(译),1981年,143页
  • 9李晃.甩额定负荷后水轮机调速器调节时间[J].大电机技术,1998(1):56-59. 被引量:5
  • 10田丰.国产600MW超临界机组甩负荷试验分析[J].汽轮机技术,2009,51(3):217-219. 被引量:11

共引文献13

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部