摘要
在矿山工程施工开挖过程中,因受周边环境、施工方法及水文地质环境等因素的影响,可能会引起基坑结构发生较大的变形和沉降,引发生产安全事故,采用正确的作业方法及工程施工变形监测方法对安全施工至关重要,本文对矿山工程施工过程中的变形监测数据进行处理与分析,以供参考。
In the process of mining engineering construction and excavation,due to the influence of surrounding environment,construction method and hydrogeological environment,it may cause large deformation and settlement of foundation pit structure,and cause production safety accidents.It is very important to adopt correct operation method and engineering construction deformation monitoring method for safety construction.In this paper,deformation monitoring in the process of mining engineering construction is carried out The data are processed and analyzed for reference.
作者
周朝能
赵春生
ZHAO Chao-neng;ZHAO Chun-sheng(Surveying and Mapping Institute of Yunnan Southern Geological Exploration Engineering Corporation,Dali 671000,China)
出处
《世界有色金属》
2020年第4期232-232,234,共2页
World Nonferrous Metals
关键词
矿山工程施工
变形监测
数据处理
方法探讨
mine engineering construction
deformation monitoring
data processing
method discussion