摘要
超大地块整体开发项目机电设计总控是根据项目开发模式升级而产生的一个新的设计模式,是为城市超大型项目复杂的界面制定一种简单的规则,并于实施过程中,在多方面进行协调,同时在项目推进过程中实时调整,最终协调一致、推动项目顺利实施。
The overall control of MEP design of the oversized block overall development project is a new work generated according to the upgrade of the project development mode.It is to formulate a simple rule for the complex interface of the urban super large project,coordinate in many aspects during the implementation process and adjust it in real time during the project promotion process.And promote the smooth implementation of the project.
作者
陆文慷
Lu Wenkang(Areplus Institule of Shanghai Architectural Design&Research Co.,Ltd.,Shanghai 200041,China)
出处
《给水排水》
CSCD
北大核心
2020年第3期121-124,共4页
Water & Wastewater Engineering
关键词
机电设计总控
整体开发项目
规则制定
MEP design master control
Overall development project
Rule making