金山区蒲泽塘项目施工涉及枫泾西北部三个圩区,该工程涉及九条河道,分为六个标段,沿线有23 km堤防需要加高加固,36座支河口泵(水)闸、涵闸需要拆除重建,受同期施工影响,其间存在较多的矛盾和问题。当前,有必要通过前期研判,紧密协调各标段进度,采取科学有力的管控措施,最终实现项目管理的预期目标。
The construction of the Puzetang project in Jinshan District involves three polder areas in the northwest of Fengjing, and the project involves nine river channels and is divided into six standard sections, the 23 km dike along the line need to be reinforced, and 36 branch river mouth pump(water) gates and culverts need to be demolished and rebuilt, affected by the construction during the same period, there are many contradictions and problems. At present,it is necessary to closely coordinate the progress of each bidding section through preliminary research and judgment,adopt scientific and powerful control measures, and finally achieve the expected goals of project management.
作者
朱建吉
ZHU Jianji(Shanghai Huajin Construction Co.,Ltd.,Shanghai 200063)
出处
《河南科技》
2020年第8期88-90,共3页
Henan Science and Technology
关键词
圩区工程
同期施工
水工建筑群
polder area project
synchronous construction
hydraulic building complex