摘要
以某工程基坑支护为例,运用PDCA管理模式对40 m深异形槽地连墙钢筋笼的施工过程进行分析,得知其施工质量的主要影响因素,利用头脑风暴法找到末端因素并确认关键要因。通过制定切实有效的对策,确保整体一次吊装40 m深异形槽地连墙钢筋笼的安装质量。
Taking the foundation pit support of a project as an example and using PDCA management mode,this paper analyzes the installation process of the reinforcement cage of 40 m deep special-shaped groove to ground-wall connecting,and obtains the main influencing factors of construction quality.Using brainstorming method,it acquires the end factors and identifies the key factors.The paper also puts forward the practical and effective measures so as to ensure the installation quality.
作者
张琪
ZHANG Qi(Shanxi Construction Investment Group Co.,Ltd.,Taiyuan,Shanxi,030002,China)
出处
《建材技术与应用》
2020年第2期27-30,共4页
Research and Application of Building Materials
关键词
异型槽地连墙
一次吊装
钢筋笼安装
special-shaped groove to ground-wall connecting
one-time hoisting
reinforcement cage installation