3BUYGI M O,BALZER G,SHANECHI H M,et al. Market based transmission expansion planning[J]. IEEE Transactions on Power System, 2004,19 (4) : 2060 - 2067.
4LI W,MANSOUR Y,KO XZYNSKI J K,et al. Application of transmission reliability assessment in probabilistic planning of BC hydro vancouver south metro system[J]. IEEE Trans PWRS, 1995,10(2) :964-970.
5CHAO X Y,FENG X M,SLUMP D I. Impact of deregulation on power delivery planning [C]//Proceedings 1999 IEEE Trans and Distribution Conf. New Orlean, USA : IEEE, 1999 : 340- 344.
6TORRE T D,FELTES J W,ROMAN J W G S,et al. Deregulation,privatization and competition:transmission planning under uncertainty[J ]. IEEE Trans PWRS, 1999,14(2) :460-465.
7LEE K Y,MANUSPIYA S,CHOI M,et al. Network congestion assessment for short- term transmission planning under deregulated environment[C]//Proceedings of IEEE Winter Meeting.Montreal ,Canada :IEEE ,2001 : 1266-1271.
8SHRESTHA G B,FONSEKA P A J. Congestion-driven transmission expansion in competitive power markets[J]. IEEE Trans on Power System,2004,19(3 ) : 1-8.
9HARP S A,BRIGNONE S,WOLLENBERG B F,et al. A simulator for electric power industry agents [J ]. IEEE Control Systems Magazine, 2000,20 ( 4 ) : 53 - 69.
10KRISHNA V,RAMESH V C. Intelligent agents for negotiations in market games. Part 1 :model [ J ]. IEEE Trans Power Syst, 1998, 13(3) : 1103-1108.