摘要
U型梁(槽型梁)作为轨道交通工程双轨高架桥梁中的新式梁型结构,其在国内越来越多的轨道交通线路建设中都采用这一梁型。本文主要对宁句线工程U型梁的不同施工方法进行简要介绍,比较该工程中现浇法和预制法在施工顺序、施工条件、施工难度、环境影响及经济性方面的优劣,从而得出各自的适用范围,为以后轨道交通工程中U型梁的设计选型和施工方法选择提供参考。
U-shaped beam(groove beam)is a new type of beam structure in double-track viaducts in rail transit engineering.It is used in more and more rail transit lines in China.This article mainly introduces the different construction methods of the U-beam of the Ningju line project,and compares the pros and cons of the cast-in-place method and the precast method in this project in terms of construction sequence,construction conditions,construction difficulty,environmental impact,and economics.The respective scope of application is provided,which provides a reference for the design and selection of U-beams and construction methods in future rail transit projects.
作者
和堂
马健博
肖恒
HE Tang;MA Jianbo;XIAO Heng(China Construction Railway Investment and Construction Group Co.,Ltd.,East China Company,Nanjing Jiangsu 210000)
出处
《智能建筑与工程机械》
2019年第4期14-16,共3页
Intelligent Building and Construction Machinery
关键词
U型梁
施工方法
现浇
预制
对比分析
U-beam
construction method
cast-in-situ
prefabrication
comparative analysis