期刊文献+

厚硬基本顶综放沿空巷道受载变形机制研究 被引量:16

Study on loading and deformation mechanism of gob-side roadway with thick and hard basic roof in fully mechanized top coal caving workface
原文传递
导出
摘要 针对厚硬基本顶综放沿空巷道回采期间两帮变形剧烈的问题,以柳巷煤矿为工程背景,通过室内试验、现场实测、理论分析和数值模拟等手段,对巷道受载变形机制进行研究。结果表明:1)综放窄煤柱巷道围岩完整度排序由高到低为顶板、实体煤帮及窄煤柱帮,采动影响下煤帮破碎直接导致两帮锚杆工况下降;2)厚硬基本顶整体破断,断裂线位于实体煤上方距采空区14~15 m,关键块回转下沉过程中与上覆岩层之间出现变形不协同,继而导致断裂线附近煤体受载加大,这是采动影响下实体煤帮出现大变形的主要原因;3)随工作面推进窄煤柱发生压剪破坏,压剪断裂线附近煤体破坏严重直接导致窄煤柱帮大变形。 In response to the problem of severe deformation of two sidewalls in gob-side roadway with thick and hard basic roof during the mining of fully mechanized caving face,with Liuxiang Coal Mine as the engineering background,roadway loading and deformation mechanism has been studied systematically through the laboratory test,field monitoring,analytical analysis,and numerical simulation.Results have shown that,1)in terms of the integrity of the rocks in the narrow coal pillar roadway,the rock in the roof is better than that in the solid-sidewall and that in the pillar-sidewall is the worst;bolt working condition of two sidewalls is decreased because of coal wall fracture caused by mining pressure,especially the pillar-sidewall;2)the thick and hard basic roof breaks entirely and its break line is above solid coal,which is 14-15 m far from the goaf.The main reason for large deformation of solid-sidewall under mining pressure is the increased load near the break line,which is caused by the uncoordinated deformation between overlying strata and the key block;3)continuous increase of mining stress causes the compression-shear failure of narrow coal pillar,and then coal body near the compression-shear failure line fractures severely,which is the direct reason for large deformation and fragmentation of pillarsidewall.
作者 蒋威 鞠文君 汪占领 张镇 JIANG Wei;JU Wenjun;WANG Zhanling;ZHANG Zhen(School of Energy and Mining,China University of Mining&Technology-Beijing,Beijing 100083,China;Coal Mining Branch,China Coal Research Institute,Beijing 100013,China;Coal Mining&Designing Department,Tiandi Science&Technology Co Ltd,Beijing 100013,China)
出处 《采矿与安全工程学报》 EI CSCD 北大核心 2020年第2期319-326,共8页 Journal of Mining & Safety Engineering
基金 国家自然科学基金项目(51774186)。
关键词 沿空掘巷 厚硬基本顶 窄煤柱 围岩变形 数值模拟 gob-side entry the thick and hard basic roof narrow coal pillar deformation of surrounding rock numerical simulation
  • 相关文献

参考文献17

二级参考文献146

共引文献2057

同被引文献176

引证文献16

二级引证文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部