摘要
前海深圳华润中心T3钢结构工程外形复杂、节点构造多样,自重较大且对安装精度要求高,其测量工作成为影响安装质量和进度的重要因素。吊装前利用BIM放样机器人对钢构件进行快速定位测量,提高了测量精度和工作效率。
The T3 steel structure project of Qianhai Shenzhen City Crossing has complex shape,different node construction and heavy weight,requiring high installation accuracy.Measurement is an important factor influencing installation quality and speed.Before lifting of the structure,BIM lofting robot was used to realize fast positioning and measurement of steel members,successfully improving the measurement accuracy and construction efficiency.
作者
孔伟
KONG Wei(China Railway Construction Group Corporation,100131,Beijing,China)
出处
《建筑技术》
2020年第2期135-137,共3页
Architecture Technology
关键词
钢结构
测量
放样机器人
steel structure
measurement
lofting robot