摘要
宁波中兴大桥施工中,针对钢塔安装难点确定采用钢塔竖转工艺,研究竖转转动铰装置的制作安装和试转工艺,满足了工程需要。
Considering the difficulties in steel tower installation during construction of Zhongxing Bridge in Ningbo,it was determined to adopt steel tower vertical rotation process.Installation and test process of vertical rotation hinge were studied and engineering requirements were successfully satisfied.
作者
杨学斌
李胜乾
周国庆
张银国
张西杰
范秋波
YANG Xue-bin;LI Sheng-qian;ZHOU Guo-qing;ZHANG Yin-guo;ZHANG Xi-jie;FAN Qiu-bo(CSCEC Jiangsu Co.,Ltd.,214532,Taizhou,Jiangsu,China)
出处
《建筑技术》
2020年第2期146-149,共4页
Architecture Technology
关键词
中兴大桥
钢塔转体施工
转动铰
Zhongxing Bridge
steel tower rotation construction
rotating hinge