中钢邢机轧辊有限公司搬迁升级项目重装机加厂钢结构厂房保护性拆除施工中,针对不同构件利旧的难点和安装风险问题,采取不同的技术措施,使拆除的构件经修复可用于新厂建设,取得了较好的经济效益。
During protective dismantlement of steel structure heavy machine factory in SinoSteel Xingtai Machinery and Mill Roll Co.,Ltd.relocation project,diversified technical measures were adopted for utilization difficulties and installation risks of different members,so as to repair and reuse the dismantled members in new factory.Favorable economic benefits were realized.