摘要
针对虎峰煤业2115工作面开采区煤层上部存在采空区和空巷的情况,结合工作面顺槽架棚支护的现状,通过采用“π”型梁支护管理工作面两侧端头和顺槽超前区顶板。现场实践表明,工作面回采过程中,工作面端头和超前区顶板管理较好,没有出现大面积网兜、落煤和落矸现象,顺槽金属棚能够及时回收,取得了较好的技术经济效益。
Aiming at the goaf in the upper part of coal seam and abandoned roadway at 2115 working face of HuFeng Coal Industry Co.Ltd.,π-typed beam support is adopted in two ends of the working face and the roof in the leading area of crossheading,which can solve the problems of large-scale string bag,coal and gangue fal and recover the metal shed crossheading in time with good technical and economic benefits.
作者
罗宝红
Luo Baohong(Huasheng Hufeng Coal Industry Co.,Ltd.,Datong Coal Mine Group.,Yuncheng,Shanxi 043300)
出处
《江西煤炭科技》
2020年第2期150-152,共3页
Jiangxi Coal Science & Technology
关键词
综放工作面
超前支护
顶板管理
架棚支护
fully mechanized caving face
advanced support
roof management
shed support