国际焦化EPC项目中的物流管理研究

Research on logistic management in international EPC coking projects
下载PDF
导出
摘要 物流管理在国际焦化EPC项目中具有重要意义,随着近年来交货方式从FOB向CIF、DAP转变的趋势,其对项目的重要性逐步增强。物流管理的水平不仅影响工程进度,甚至影响项目的成本和盈利。本文分析了国际焦化EPC项目物流管理特点,总结了影响物流管理的关键环节,研究了焦化项目物流成本控制要素。 Logistic management plays a significant role in international EPC coking projects.With trend of FOB being transformed to CIF and DAP for terms of delivery in recent years,the logistics management becomes increasingly important to international projects.The level of logistic management would not only impact on the progress,but also affect the cost and profit of the project.This paper analyzes the features of logistic management in international EPC coking projects,summarizes the critical steps interlinked with logistic management and studies the factors for logistic cost control in the coking projects.
作者 郑子光 张琪 Zheng Ziguang;Zhang Qi(ACRE Coking&Refractory Engineering Consulting Corporation(Dalian),MCC,Dalian 116085,China)
出处 《燃料与化工》 2020年第3期5-7,共3页 Fuel & Chemical Processes
关键词 国际EPC项目 焦化项目 物流管理 International EPC projects Coking project Logistic management
  • 相关文献

参考文献2

二级参考文献5

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部