摘要
以高达280 m的上海前滩中心项目为例,阐述在超高层建筑大空间屋顶塔冠结构建造过程中的关键部署及技术方案。通过高效组织、管控各专业单位实施施工作业,从而使项目在工期、质量、安全及经济等方面达到最优化。总结的相关经验可为类似工程提供参考。
Taking the 280 m high Shanghai foreshore center project as an example,this paper expounds the key deployment and technical scheme in the construction process of large space roof tower crown structure of super high-rise building.Through the efficient organization and control of the construction work carried out by various professional units,the project is optimized in terms of construction period,quality,safety and economy.The relevant experience can provide reference for similar projects.