地铁隧道工程中喷射混凝土的超耗分析及控制措施 被引量:5

Analysis and Control Measures of Excess Consumption of Shotcrete in Subway Tunnel Engineering
下载PDF
导出
摘要 喷射混凝土在地铁隧道工程中用量很大,因此喷射混凝土的超耗是成本控制的关键。结合工程实例,通过分析施工过程中各环节超耗的原因,制定了相应的控制措施,有效地控制了隧道喷射混凝土施工时的超耗现象,可为类似工程参考。 Shotcrete is widely used in subway tunnel engineering,the excess consumption of shotcrete is the key to cost control.Combined with the project example,through the analysis of the causes of the excess consumption in each link of the construction process,the corresponding control measures are formulated,which effectively control the excess consumption phenomenon in the construction of the shotcrete in the tunnel,and can be used as a reference for similar projects.
作者 潘争 PAN Zheng(China Railway 18th Bureau Group Third Engineering Co.,Ltd.,Zhuozhou,Hebei 072750,China)
出处 《建筑施工》 2020年第4期599-600,共2页 Building Construction
关键词 地铁隧道 喷射混凝土 超耗 原因分析 控制措施 subway tunnel shotcrete excess consumption cause analysis control measures
  • 相关文献

参考文献2

二级参考文献2

  • 1JTJ041-2000.公路隧道施工技术规范隧道开挖技术标准[S].
  • 2公路工程标准施工招标文件(2009年版)[S].

同被引文献32

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部