摘要
环境保护验收由行政许可变更为企业自主验收后,企业承担主体责任,也是督促和要求企业加强包括试生产、验收监测和竣工环境保护验收各环节环境保护管理.作者结合自身环境保护工作经验对建设项目环境保护设施自主验收管理进行了分析总结.
After environmental protection acceptance changed from administrative permission to enterprise independent acceptance,the enterprise assumes the main responsibility and also urges and requires the enterprise to strengthen environmental protection management in all aspects including trial production,acceptance monitoring and completion of environmental protection acceptance.The author has analyzed and summarized the independent acceptance management of environmental protection facilities of construction projects based on his own environmental protection work experience,with a view to providing a strong reference and support for related work.
作者
谭科峰
TAN Ke-feng(EHS Dept.of CNOOC Huizhou Petrochemical Co.,Ltd.,Huizhou 516086,China)
出处
《化工管理》
2020年第13期190-191,共2页
Chemical Engineering Management
关键词
建设项目
环境保护设施
自主验收
管理
construction project
environmental protection facilities
independent acceptance
management