摘要 支付问题是项目管理的核心问题之一,影响到项目的费用、工期、现金流等方面的正常运转。作为目前被广泛使用的合同条款、JCT条款和FIDIC条款对于支付问题都有详细的规定。然而,在2016—2017年JCT和FIDIC条款相继更新后,目前学界对于这2个新版合同条款的研究及其对比分析却较少。选取了设计-建造(Design-Build)合同模式,针对其支付问题,以这2个合同范本作实例并进行对比分析。 Payment issue is one of the core issues of project management,which affects project cost,schedule,cash flow and other aspects.As the widely used contract terms,JCT terms and FIDIC terms have detailed provisions on payment management.However,after the JCT and FIDIC terms were updated successively in 2016 and 2017,there are few studies and comparative analysis on the two new versions.Aiming at the payment issues,this paper selects the Design-Build contract mode to perform comparative analysis based on these two contract terms.
作者 王明皓 Wang Minghao(SINOPEC Engineering Incorporation,Beijing,100101)
出处 《石油化工设计》 CAS 2020年第2期30-34,I0002,共6页 Petrochemical Design
关键词 JCT条款 FIDIC条款 设计-建造合同 支付管理 JCT clause FIDIC clause design-build contract payment management
  • 相关文献

参考文献1

二级参考文献2

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部