期刊文献+

不可修复产品的组合维修和备件供应策略 被引量:2

Combined maintenance and spare supply strategy of unrepairable product
下载PDF
导出
摘要 为了保证产品的技术状态,避免发生失效,部分不可修复产品会采取定期维护与视情更换的组合维修策略,其中备件供应直接影响产品的维修能力。针对该类产品,重点对其组合维修策略和备件供应策略进行了联合优化研究。首先,分析了定期维护条件下产品的性能变化特点,结合累积失效理论,利用复合泊松过程建立了该条件下产品的性能退化模型;其次,给出了组合维修与备件供应策略要求,并构建了产品维修和备件供应概率模型;再次,建立了以产品长期运行条件下费用率最低为目标的优化模型,对维护周期、预防性更换阈值、备件供应时刻等策略值进行了优化确定;最后,利用算例分析了费用率与策略值之间的关系,并说明了该策略的优点。 In order to ensure product state and avoid failure,some unrepairable products may adopt the maintenance strategy which combines scheduled servicing with preventive replacing,and the ability of spare supply plays an important role in the maintenance.For this kind of product,the combined maintenance and spare supply strategy are reached deeply.Firstly,the characters of performance on scheduled servicing are analyzed.Considering the cumulative failure theory,the performance deteriorate model is established by the composite Poisson process.Secondly,the requirements of combined maintenance and spare supply are given.On the basis of it,the probability model is also given.Thirdly,the optimization model is developed to determine the optimal servicing period,preventive replacing threshold and spare supply time,with an objective to minimize the products long-run cost rate.Finally,the relationship between the cost rate and strategy values is analyzed by numerical examples.It also demonstrates the advantages of the strategy.
作者 林名驰 钟强晖 李大伟 LIN Mingchi;ZHONG Qianghui;LI Dawei(Department of Management Engineering and Equipment Economics,Naval University of Engineering,Wuhan 430033,China;School of Ordnance Engineering,Naval University of Engineering,Wuhan 430033,China;Unit 91550 of the PLA,Dalian 116023,China)
出处 《系统工程与电子技术》 EI CSCD 北大核心 2020年第6期1417-1423,共7页 Systems Engineering and Electronics
关键词 维修策略 备件供应 组合维修 复合泊松过程 决策优化 maintenance strategy spare supply combined maintenance composite Poisson process decision optimization
  • 相关文献

参考文献7

二级参考文献66

  • 1李德毅,刘常昱.论正态云模型的普适性[J].中国工程科学,2004,6(8):28-34. 被引量:880
  • 2郭大德.金属化膜电容器的损耗分析及损坏机理[J].电力电容器,1995(2):12-15. 被引量:27
  • 3李德毅,孟海军,史雪梅.隶属云和隶属云发生器[J].计算机研究与发展,1995,32(6):15-20. 被引量:1212
  • 4张涛,郭波,谭跃进.面向任务的维修资源配置决策支持系统研究[J].兵工学报,2005,26(5):716-720. 被引量:15
  • 5J B Ennis et al.Self-healing pulse capacitors for the national ignition facility(NIF)[A].Proceeding of 12th IEEE International Pulsed Power Conference[C].Monterey(USA),1999.118.
  • 6D Larson,F W MacDougall,P Hardy et al.The impact of high energy density capacitors with metallized electrode in large capacitor banks for nuclear fusion application[A].The 9th IEEE Pulsed Power Conference[C].Albuquerque,NM,USA,1993.
  • 7Zhang X Q, Gao H, Determining an optimal maintenance period for infrastructure systems. Computer Aided Civil and Infrastructure Engineering, 2012, 27(7): 543-554.
  • 8Rangel-Ramirez J G, Sorensen J D. Risk-based inspection planning optimisation of offshore wind turbines. Structure and Infrastructure Engineering, 2012, 8(5): 473-481.
  • 9Wang Q F, Liu W B, Zhong X, et al. Development and application of equipment maintenance and safety interity management system. Journal of Loss Prevention in the Process Industries, 2011, 24 : 321-332.
  • 10Nakagawa T, Mizutani S. A summary of maintenance pol ieies for a finite interval. Reliability Engineering and Sys tem Safety, 2009, 94(1)~ 89-96.

共引文献87

同被引文献17

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部