越南某电厂新建煤码头排水系统设计方案优化

Design optimization of drainage system for new coal terminal of power plant in Vietnam
下载PDF
导出
摘要 越南某燃煤电厂为满足当地电力的发展需求,拟对电厂进行扩建,并新建煤码头及输煤系统。针对外方提供的新建煤码头排水系统设计方案,从技术和经济角度展开全面分析,指出外方设计的排水系统存在的不足。结合国内煤码头排水系统的习惯做法,通过对比分析,对外方设计的排水系统进行优化,以满足码头区域雨水和冲洗废水“零排放”的环保要求。 In order to meet the development needs of local power,Vietnam plans to expand the coal-fired power plant and builds a new coal terminal and coal conveying system.In view of the design scheme for the drainage system of the new coal terminal provided by the foreign party,we carry out a comprehensive analysis from the technical and economic point of view,and point out the shortcomings of the drainage system designed by the foreign party.Combining with the common practice of the drainage system of the coal terminal in China,and based on the comparative analysis,we optimize the drainage system designed to meet the environmental protection requirements of“zero discharge”of rainwater and flushing wastewater in the terminal area.
作者 李华平 汪莲 LI Hua-ping;WANG Lian(CCCC Third Harbor Consultants Co.,Ltd.,Shanghai 200032,China)
出处 《水运工程》 北大核心 2020年第5期163-167,共5页 Port & Waterway Engineering
关键词 煤码头 排水系统 设计方案 优化 coal terminal drainage system design schemes optimization
  • 相关文献

参考文献3

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部