基于改进可拓物元的湿地公园PPP项目绩效评价研究 被引量:1

Research on Performance Evaluation of Wetland Park PPP Project Based on Improved Extension Matter Element
下载PDF
导出
摘要 绩效评价是政府对PPP项目按效付费的依据。基于项目过程思维,从项目投入、过程、产出和效果四个方面构建湿地公园PPP项目绩效评价指标体系,引入改进的可拓物元模型,对贵安新区海绵城市试点两湖一河PPP项目绩效进行评价。评价结果显示该项目绩效水平达到优秀,但仍有提升空间。 Performance evaluation is the basis for local government to pay PPP project of wetland park.Based on the project process thinking,this paper constructs the PPP project performance evaluation index system of wetland park from four aspects of project input,process,output and effect,and introduces the improved extension matter element model to evaluate the performance of Two Lakes and One River PPP Project in Gui’an New Area.The evaluation results show that the performance level of this project is excellent,but there is still room for improvement.
作者 卢金山 周志鹏 蒋安和 张军 卢建新 LU Jinshan;ZHOU Zhipeng;JIANG Anhe;ZHANG Jun;LU Jianxin(CCCC Fourth Highway Engineering Bureau Co.,Ltd,Guiyang 550031,China;School of Finance,Zhongnan University of Economics and Law,Wuhan 430073,China)
出处 《建筑经济》 北大核心 2020年第5期30-34,共5页 Construction Economy
基金 中交第四公路工程局有限公司研发项目(GAZB-FWHT-2019-01) 中南财经政法大学研究生创新项目(201810566)。
关键词 湿地公园 PPP项目 绩效评价 改进可拓物元 wetland park PPP project performance evaluation improved extension matter element
  • 相关文献

参考文献3

二级参考文献56

  • 1孟宪海.关键绩效指标KPI——国际最新的工程项目绩效评价体系[J].建筑经济,2007(2):50-52. 被引量:37
  • 2Yuan J F,Miroslaw J S,Li Q M,Zheng L. Performance Objectives Selection Model in Public Private Partnership Projects Based on the Perspective of Stakeholders[J].Journal of Management in Engineering,2010,(02):89-104.doi:10.1061/(ASCE)ME.1943-5479.0000011.
  • 3Egan J. Rethinking construction:report of the construction task force on the scope for improving the quality and efficiency of UK construction[R].Department of the Environment,Transport and the Region,London,1998.
  • 4TurnerRJ. The Handbook ofProject-Based Management[M].London:McGraw-Hill Companies,1993.
  • 5Atkinson A A,Waterhouse J H,Wells,R.B. A stakeholder approach to strategic performance measurement[J].Sloan Management Review; Cambridge,1997,(03):25-37.
  • 6Wateridge J. How can IS/IT projects be measured for success[J].international Journal of Project Managment,1998,(01):59-63.doi:10.1016/S0263-7863(97)00022-7.
  • 7Takim R,Akintoye A. A Performance indicators for successful construction project perfornance[A].University of Northumbria,.doi:10.1176/appi.ajp.2009.09010038.
  • 8Li B,Akintoye A,Edwarcds P J,Hardcastle C. Critical success factors for PPP/PFI projects in the UK construction industry[J].Construcction Management and Economics,2005,(05):459-471.doi:10.1080/01446190500041537.
  • 9Qiao L,Wang S Q,Tiong R L K,Chan T S. Franework for critical success factors of BOT projects in China[J].Joumal of Project Finance,.doi:10.1016/j.surfcoat.2010.08.035.
  • 10Bloomfield P. The Challenging Business of Long-Term Public-Private Partnerships:Reflections on Local Experience[J].Public Administration Review,2006,(6):400-411.doi:10.1016/j.biortech.2008.10.026.

共引文献108

同被引文献13

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部