期刊文献+

基于ISM的预制构件生产风险因素分析 被引量:5

Analysis of Risk Factors of Prefabricated Component Production Based on ISM
下载PDF
导出
摘要 在文献研究和实地调研访谈的基础上,应用扎根理论将预制构件生产的风险因素归纳为4个方面:技术风险因素、组织管理风险因素、经济风险因素和人员风险因素;并引入解释结构模型(ISM)理论,分析风险因素间的相互关系,构建预制构件生产风险因素ISM模型。模型将风险因素划分为五级,可概括为直接影响因素、间接影响因素和根本影响因素三类,且针对根本影响因素提出具体的风险管控措施,以期提高预制构件的生产效率。 On the basis of literature research and field research interviews,this paper summarizes the risk factors of prefabricated component production into four aspects based on grounded theory,including technical risk factors,organizational management risk factors,economic risk factors,and personnel risk factors.Then,analyzes the relationship between risk factors by introducing the theory of Interpreted Structural Model(ISM),and constructs a risk factors ISM model of prefabricated component production.The model divides risk factors into five levels,which can be summarized into three categories:direct influence factors,indirect influence factors,and fundamental influence factors.Finally,proposes specific risk management and control measures for the fundamental influence factors to improve production efficiency of the prefabricated component.
作者 刘妍 黎倩倩 姚福义 纪颖波 LIU Yan;LI Qianqian;YAO Fuyi;JI Yingbo(School of Civil Engineering,North China University of Technology,Beijing 100144,China;School of Management Science and Real Estate,Chongqing University,Chongqing 400044,China)
出处 《建筑经济》 北大核心 2020年第4期116-120,共5页 Construction Economy
关键词 预制构件 生产效率 风险管理 扎根理论 prefabricated component production efficiency risk management grounded theory
  • 相关文献

参考文献4

二级参考文献24

  • 1Lung-Chuang Wang. Enhancing construction quality inspection and management using RFID technology[J].Automation in Construction,2007,(04):467-479.
  • 2Samuel Y.L.Yin,H.Ping Tserng,J.C.Wang. Developing a precast production management system using RFID technology[J].Automation in Construction,2009,(18):677-691.
  • 3Edward J.Jaselskis. Tarek EI-Misa la mi.Implementing radio frequency identification in the construction process[J].Journalof Construction Engineering and Management,2003,(06):680-688.
  • 4Tom Tilson. RFID in Precast Concrete Plants Improves Productivity[DB/OL].http://EzineArticles.com/? expert =Tom_Tilson,2009.
  • 5Sangyoon Chin,Su-Won Yoon,Yea-Sang Kim. Realtime 4D CAD + RFID for Project Progress Management[A].San Diego,California,USA,2005.
  • 6Esin Ergen,Burcu Akinci,Rafael Sacks. Life-cycle data management of engineered-to-order components using radio frequency identification[J].Advanced Engineering Informatics,2007,(21):356-366.
  • 7Esin Ergen,Burcu Akinci,Rafael Sacks. Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS[J].Automation in Construction,2007,(16):354-367.
  • 8B Ramasehan, Puay Choon Loo. Factors Affecting a Partner's Perceived Effectiveness of Strategic Business Alliance Some Singaporean Evidence [J]. International Business Review, 1998, (7) :443-458.
  • 9王晓明.预制混凝土衬砌管片生产的质量控制[J].浙江建筑,2009,26(10):62-66. 被引量:5
  • 10方仁玉,车蜀涛,崔希勇,胡新丽.蒸养预制混凝土管片专用水泥的生产与质量控制[J].水泥,2010(2):22-24. 被引量:1

共引文献51

同被引文献47

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部