摘要
以山西宁武大运华盛南沟煤业4504工作面掘进期间的冲击地压研究为背景,分析得到冲击地压的发生机理,通过对掘进迎头、巷道两帮及底板进行大直径钻孔压爆破卸压,化化巷道断面并采用合理支护方法,现场的冲击危险性得到有效控制。
Based on the study of rockburst during the excavation of 4504 working face of Shanxi Ningwu Dayun Huasheng Nangou Coal Industry Co.,Ltd.,the mechanism of rockburst is analyzed.Through the large-diameter drilling and blasting pressure relief on the head of the excavation,the two sides of the roadway and the floor,the roadway section is changed and the reasonable support method is adopted,the impact risk on the site is effectively controlled.
作者
弓建伟
GONG Jianwei(Shanxi Ningwu Dayun Huasheng Nangou Coal Industry Co.,Ltd.,Ningwu Shanxi 036700,China)
出处
《山西化工》
2020年第2期88-90,共3页
Shanxi Chemical Industry
关键词
冲击地压
发生机理
防治
rockburst
occurrence mechanism
preventionandcontrol