摘要
在成都地铁项目中,以解决施工问题和对BIM技术的应用为出发点,主要阐述了BIM技术在优化调整、预制加工、一体化装配等方面的应用,并形成了全新的施工组织模式。提高了BIM模型与现场实物吻合度,打通了BIM模型与数字化设备间的数据链,实现了机电安装施工技术的革新。
In Chengdu Metro project, starting from solving construction problems and application of BIM technology, this paper mainly expounds the application of BIM technology in optimization adjustment, prefabrication processing, integrated assembly and other aspects, and forms a new construction organization mode. The data link between BIM model and digital equipment is opened, and the innovation of mechanical and electrical installation technology is realized.
作者
邓福平
DENG Fu-ping(CCCC Electrical and Mechanical Engineering Co.Ltd.,Beijing 10008 China)
出处
《工程建设与设计》
2020年第9期166-167,170,共3页
Construction & Design for Engineering
关键词
地铁
BIM
机电安装
工厂化预制加工
模块化安装
subway
BIM
mechanical and electrical installation
factory prefabricated processing
modular installation