24m长废旧混凝土方桩拔除施工技术 被引量:1

Construction Technology of Pulling out 24m Long Waste Concrete Square Pile
下载PDF
导出
摘要 结合上海交通大学医学院附属新华医院小儿外科临床医学中心楼和上海市血液中心杨浦分站工程(以下简称小儿外科临床中心楼工程)旧混凝土方桩的拔除实例,介绍了在施工过程中,5次变更拔桩施工工艺,最终顺利安全完成旧桩拔除任务。 Combined with the removal examples of old concrete square piles in the clinical center building of pediatric surgery of Xinhua Hospital Affiliated to Shanghai Jiaotong University Medical College and Yangpu sub station project of Shanghai Blood Center(hereinafter referred to as the clinical center building project of pediatric surgery), this paper introduces the construction technology of 5 times of pile removal in the construction process, and finally successfully and safely completes the task of old pile removal.
作者 郭成林 GUO Cheng-lin(Shanghai Fuqin Construction EngineeringManagement Co.Ltd.,Shanghai 200120,China)
出处 《工程建设与设计》 2020年第9期242-244,共3页 Construction & Design for Engineering
关键词 混凝土预制方桩 旧桩拔除 技术优化 precast concrete square pile old pile removal technology optimization
  • 相关文献

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部