无缝线路道岔插铺施工技术的应用 被引量:4

Application of jointless track turnout anchor construction technology
下载PDF
导出
摘要 道岔插铺在站改施工及既有线改造时经常遇到,在不同的施工条件下,采取的施工方法有所不同。以太原西南环铁路刘家堡线路所插铺道岔施工为例,从施工方法、人员组织、安全注意事项等方面详细阐述了道岔插铺施工技术,为今后类似情况施工积累了经验。 It is often met during the station-to-shop and existing line-to-shop construction of turnout. Under different construction conditions,different construction methods are adopted. In this paper,taking the construction of inserting and laying turnout in Liujiapu Line of southwest ring railway in Taiyuan as an example,the construction technology of inserting and laying turnout is described in detail from the aspects of construction technology,personnel organization and matters needing attention for safety,the experience has been accumulated for the construction of similar situation in the future.
作者 张康乐 Zhang Kangle(China Railway 15th Bureau Group Road and Bridge Construction Co.,Ltd.,Nanjing 210000,China)
出处 《山西建筑》 2020年第11期128-130,共3页 Shanxi Architecture
关键词 既有线施工 无缝线路 道岔插铺 existing railway construction jointless track inserted laying switch
  • 相关文献

参考文献12

二级参考文献28

  • 1杨宏伟,孙柏辉.客运专线高速道岔铺设技术探讨[J].铁道标准设计,2009,29(S1):16-18. 被引量:6
  • 2沈长耀.我国铁路道岔整体技术发展的新阶段[J].铁道工程学报,2005,22(1):51-60. 被引量:13
  • 3周晓光,张强,胡望斌.基于Vague集的TOPSIS方法及其应用[J].系统工程理论方法应用,2005,14(6):537-541. 被引量:55
  • 4铁建设[2008]14号,改建既有线和增建第二线铁路工程施工技术暂行规定[S].
  • 5中华人民共和国铁道部.铁建设[2005]160号客运专线铁路轨道工程施工质量验收标准[S].北京:中国铁道出版社,2007.
  • 6铁道科学研究院.客运专线道岔暂行技术条件[Z].北京:铁道部,2006.
  • 7prEN13231-1轨道施工验收、第一部分[Z].轨道施工,1998.
  • 8中国铁道建筑总公司.客运专线铁路轨道工程施工质量验收暂行标准[Z].北京:铁道部,2005.
  • 9王树国,张玉林.客运专线60 kg/m钢轨18号有砟道岔胶州北站试铺与综合试验报告[R].北京:铁道科学研究院,2006.
  • 10TB10101--99,新建铁路工程测量规范[S].

共引文献25

同被引文献28

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部