5Hubert Kirrmarm, Mats Hansson, Peter Muri. IEC 62439 PRP: bumpless recovery for highly available, hardreal-time industrial networks[C]. //12th IEEE Conference Emerging on Technologies & Factory Automation. 2007.
6IEC 62439 high availability automation networks[S].
7MEIER S, WEIBEL H. IEEE 1588 applied in the environment of high availability LANs[C]// Proceedings of IEEE International Symposium on Precision Clock Synchronization for Measurement, Control and Communication, October 3-7, 2007, Vienna, Austria: 100-104.
8KIMNANN H, RICTMANN P, KUNSUAN S. IEC 61850 standard network redundancy using IEC 62439 [EB/OL]. [ 2010-05-01 ]. http://www, pacw. org/fileadmin/doe/ Autumn Issue08/redundancy autumn08, pdf.
9IEC-62439 high availability automation networks[S].2008.
10IEC 62439-3-2010 high availability automation networks-part 3: parallel redundancy protocol (PRP) and high-availability seamless redundancy (HSR)[S].