深水沉管隧道基槽精细化施工及监测技术 被引量:5

Fine construction and monitoring technology of tube trench of deepwater immersed tunnel
下载PDF
导出
摘要 依托港珠澳大桥岛隧工程基槽疏浚工程实践,通过设备技术改造和新工艺研究实现基槽精挖、清淤等关键工序高标准要求,同时系统开发了沉管隧道施工监测技术严控基槽施工质量,准确监测基槽回淤情况,对异常回淤、边坡稳定性进行预警,指导隧道沉管安放前的边坡清淤及槽底清淤,防范施工风险。 Relying on the dredging practice of the Hongkong-Zhuhai-Macao Bridge island&tunnel project,through the equipment technical reform and the new technology research,the high standard requirements of key processes such as accurate dredging and desilting of the tube trench were realized.At the same time,the construction monitoring technology of the tube trench was systematically developed to strictly control the construction quality and accurately monitor the back-silting situation,to warn for abnormal back-filling and slope stability,to guide the dredging of the slope and the bottom of the tube trench before the placement of the tube immersed,to prevent construction risks.
作者 陶宗恒 杨秀武 TAO Zong-heng;YANG Xiu-wu(CCCC Guangzhou Dredging Co.,Ltd.,Guangzhou,Guangdong 510221,China)
出处 《中国港湾建设》 2020年第5期44-48,共5页 China Harbour Engineering
关键词 港珠澳大桥 基槽 精挖 清淤 回淤监测 边坡清淤 Hongkong-Zhuhai-Macao Bridge tube trench accurate dredging desilting back-silting monitoring slope dredging
  • 相关文献

参考文献6

二级参考文献12

  • 1港珠澳大桥管理局.港珠澳大桥主体工程隧道工程施工及质量验收标准[s].修订版.2013.
  • 2JT/T790-2010,多波束测深系统测量技术要求[s].
  • 3JT/T 790—2010,多波束测深系统测量技术要求[S].
  • 4中交公路规划设计院有限公司.港珠澳大桥主体工程岛隧工程施工图设计[R]. 2011.
  • 5JTS 257—2008,水运工程质量检验标准[S].
  • 6中交公路规划设计院有限公司. 港珠澳大桥主体工程岛隧工程施工图设计:沉管隧道[R]. 2011.
  • 7中交股份联合体港珠澳大桥岛隧工程第IV 工区项目经理部.港珠澳大桥岛隧工程E14 管节末端钢封门前回淤基床处置施工安全保障专项措施[R]. 2014.
  • 8中交股份联合体港珠澳大桥岛隧工程第IV 工区项目经理部.港珠澳大桥岛隧工程沉管隧道基槽清淤施工方案[R]. 2012.
  • 9高耿明,潘润秋.基于多波束测深的海底沉管基槽回淤监测与分析[J].测绘信息与工程,2010,35(4):32-33. 被引量:8
  • 10郑伟,李炜.GPS-RTK三维水下地形测量的应用与误差分析[J].中国港湾建设,2015,35(7):42-45. 被引量:25

共引文献28

同被引文献31

引证文献5

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部