摘要
针对某矿综采工作面过大面积空巷顶板控制难的问题,本文充分利用理论结合实际,分析了大面积空巷顶板控制难点,然后制定了针对性的综合控制方案,为类似条件下综采工作面过大面积空巷提供借鉴。
In view of the difficulty in roof control of large-area gob-side entry in a fully mechanized mining face of a mine,this paper makes full use of theory and practice,analyzes the difficulties in roof control of large-area gob-side entry,and then formulates a targeted comprehensive control scheme,which provides reference for large-area gob-side entry in fully mechanized mining face in similar conditions.
作者
裴晖
Pei Hui(Shuiyu Coal Industry,Shanxi Fenxi Mining Group,Shanxi,032300)
出处
《当代化工研究》
2020年第10期51-52,共2页
Modern Chemical Research
关键词
综采工作面
大面积空巷
顶板控制
fully mechanized working face
large-area gob
roof control