摘要
高速工程施工中,现浇梁顶升是重要环节,若缺乏安全管理措施,将对桥梁施工质量造成影响,从而出现不满足设计要求的情况。因此,要通过合理的方式避免这一问题,确保桥梁受力合理性,提升桥梁整体安全性。文章从工程实例出发,探讨现浇梁顶升作业中可行的安全控制措施,以期给同行提供参考。
In high-speed engineering construction,the jacking of cast-in-place beam is an important link.Therefore,it is necessary to avoid this problem in a reasonable way to ensure the rationality of the bridge stress and improve the overall safety of the bridge.In this paper,the feasible safety control measures in the jacking operation of cast-in-place beam are discussed based on an engineering example,so as to provide reference for peers.
作者
王鹏
Wang Peng(The Fifth Project Co.Ltd.,of China Railway Bureau 14 Group,Jini ng,Shandong 272117)
出处
《工程技术研究》
2020年第5期179-180,共2页
Engineering and Technological Research
关键词
现浇梁
顶升
高速公路
施工安全
cast-in-situ beam
top up
construction safety