期刊文献+

储能式充电桩参与电网需求侧响应联合运行优化

Energy Storage Charging Pile Participates in the Demand Side Response Joint Operation Optimization of Power Grid
下载PDF
导出
摘要 储能式充电桩是一种通过与电网相连增加电能储存量的汽车充电装置.有其参与电网运行,在大幅降低电网扩容成本的同时,还能通过电网需求侧响应辅助管理收益,有效降低其运营成本.对充电桩收益有直接影响的就是需求侧响应中实时定价的激励,为探究其对充电桩收益的影响,本文将对储能式充电桩与电网需求侧响应的联合运行优化能量调度进行研究,通过建立函数模型,计算其所获收益. The energy storage charging pile is a kind of vehicle charging device which increases the storage capacity by connecting with the power grid.With its participation in power grid operation,the cost of power grid expansion can be greatly reduced,and at the same time,the operation cost can be effectively reduced through the corresponding auxiliary management income of power grid demand side.The incentive of real-time pricing in demand side response has a direct impact on the return of charging piles.In order to explore its impact on the return of charging piles,this paper will study the joint operation of energy storage charging piles and grid response side to optimize energy scheduling,and calculate the return by establishing a functional model.
作者 秦毓毅 Qin Yu-yi
出处 《电力系统装备》 2020年第7期189-191,共3页 Electric Power System Equipment
关键词 储能式充电桩 电网需求侧 联合运行优化 energy storage charging pile grid demand side joint operation optimization
  • 相关文献

参考文献6

二级参考文献10

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部