摘要 为进一步接纳新能源发电量,防止新能源弃电情况发生,火电机组低负荷运行和深度调峰势在必行。辽宁清河发电有限责任公司1号、9号机组深度调峰已经运行3年,供热首站6000 kW背压汽轮机组已经成功运行3个供暖期,从改造目标、改造方案和经济性进行论证将供热背压机组排汽引入到600 MW机组深调运行的可行性,并对机组深调期间的经济性和稳定性进行分析,为火电机组低负荷运行和深度调峰提供参考。 With the continuous increase of new energy installed capacity,to further accept new energy power generation and to prevent new energy waste,low load operation and depth peak-shaving of thermal power units are imperative.No.1 and No.9 units have been in depth peak-shaving for 3 years.The 6000 kW back-pressure turbine unit in the first heating station has been successfully operated for three heating periods.This paper expounds from three aspects of transformation goal,transformation plan and economic analysis.The feasibility of introducing exhaust steam from heat supply back-pressure unit into 600 MW depth peak-shaving unit is demonstrated.The economy and stability of the unit during depth peak-shaving are analyzed.
作者 邹文英 刘昕成 刘焕武 ZOU Wenying;LIU Xincheng;LIU Huanwu(Liaoning Qinghe Power Generation Co.,Ltd.,Tieling,Liaoning 112003,China;CPI Northeast Energy Technology Co.,Ltd.,Shenyang,Liaoning 110179,China)
出处 《东北电力技术》 2020年第5期43-46,共4页 Northeast Electric Power Technology
关键词 供热背压机组 深度调峰 经济收益 heat supply back-pressure unit depth peak-shaving economic gains
  • 相关文献

参考文献8

二级参考文献18

  • 1彭泽瑛,顾德明.补汽调节阀技术在百万千瓦全周进汽汽轮机中的应用[J].热力透平,2004,3(300):223-227. 被引量:31
  • 2金黔军.1 000 MW超超临界机组热控设计特点[J].中国电力,2006,39(3):78-81. 被引量:18
  • 3何阿平,彭泽瑛.上汽-西门子型百万千瓦超超临界汽轮机[J].热力透平,2006,35(1):1-7. 被引量:41
  • 41000MW超超临界中间再热凝汽式蒸汽轮机说明书[Z].上海汽轮机厂内部文件.2008.10.
  • 5GB/T8117.2-2008,汽轮机热力性能验收试验规程,第二部分:方法B各种类型和容量的汽轮机宽准确度试验[S].2008.
  • 6国际公式化委员会.水和水蒸汽性质表:工业用IAPWS--IF97方程[M].1997.
  • 7Rudolf Kral, Bert Rukes, Oldrich Zaviska.Reserves for Top-Quality Power[J]. Siemens Power Journal, 4/98.
  • 8Heinrich Oeynhausen. Armin Drosdziok. Mathias Deckers. Steam Turbine for the New Generation of Powet Plants[J]. VGB Kraftwerkstechnik,1996,76 (12).
  • 9Overload Valve Design and Operational Characteristics[Z]. Siemens Power Generation,4/2004.
  • 10林万超.火电厂热系统定量分析[M].西安:西安交通大学出版社,1991..

共引文献86

同被引文献11

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部