安家岭露天矿半连续采运系统

Semi-continuous Mining and Transport System in Anjialing Open-pit Mine
下载PDF
导出
摘要 以安家岭露天矿半连续采运系统为例,着重介绍安家岭露天矿正在开发的3 200 t/h原煤采运系统项目,对其开采工艺流程、主要工艺参数及主要开采成套装备的组成、性能及工作原理进行全面、客观地分析和阐述,为大型露天矿半连续采运工艺及成套装备选择配置提供参考。 Taking the semi-continuous mining and transport system in Anjialing open-pit mine as the research object,introduced specifically the 3 200 t/h raw coal mining and transport system project in Anjialing open-pit mine. The exploit technology procedure,main parameters of the technology and composition, performance and operation principle of main mining complete set of equipment have been analyzed and expounded objectively in an all-round way. It provides reference for semi-continuous mining and transport technology and complete set of equipment disposition choice.
作者 张西锋 王泰基 Zhang Xifeng;Wang Taiji(CHN Energy Shendong Coal Group Co.,Ltd.,Yulin 719315,China)
出处 《煤矿机械》 北大核心 2020年第5期135-138,共4页 Coal Mine Machinery
基金 国家高技术研究发展计划(863计划)资助项目(2012AA062002)。
关键词 露天矿 半连续采运系统 开采工艺 成套装备 open-pit mine semi-continuous mining and transport system exploit technology complete set of equipment
  • 相关文献

参考文献7

二级参考文献19

共引文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部