暖通空调施工项目具备非常强的复杂性,所以在施工中存在很多问题且不易解决,造成工程的质量和施工进度得不到保障。从实际情况分析可以发现,影响暖通空调工程质量的因素非常多,资金、设备、材料等都是主要因素,设计方案与管理水平的影响也是不能忽视的,所以需要引起足够的重视,加强监督与管理。
the hvac construction project has a very strong complexity,so there are many problems in the construction and not easy to solve,resulting in the quality of the project and construction progress can not be guaranteed.From the analysis of the actual situation,it can be found that there are many factors that affect the quality of hvac engineering.Capital,equipment and materials are the main factors,and the influence of design scheme and management level cannot be ignored.Therefore,sufficient attention should be paid to strengthen the supervision and management.