谈如何在预可研阶段做好工程造价控制

How to Control the Project Cost in the Pre-research Stage
下载PDF
导出
摘要 工程造价控制是现代工程建设、管理的核心工作之一,要求在现有基础上不断予以完善。本文以预可研阶段工程造价控制作为分析对象,论述该阶段工程造价控制的关键点,再以此为基础,分析预可研阶段的工程造价控制思路,最后从递进关联的角度,就工程造价控制的后续方法进行论述,给出构建精细化作业模式、加强数据挖掘和复用、重点项目的拆分等内容,服务后续工作。 Engineering cost control is one of the core works of modern engineering construction and management,which requires continuous improvement on the existing basis.This paper takes the project cost control in the pre feasibility study stage as the analysis object,discusses the key points of the project cost control in this stage,and then based on this,analyzes the project cost control ideas in the pre-feasibility study stage.Finally,from the perspective of progressive correlation,the follow-up methods of engineering cost control are discussed,and details such as constructing a refined operation mode,strengthening data mining and reuse,and splitting of key projects are provided to serve subsequent work.
作者 杨波 YANG Bo(Branch No.5 of Sinohydro Bureau 7 Co,Ltd,Meishan 620860,China)
出处 《建材世界》 2020年第2期77-79,共3页 The World of Building Materials
关键词 预可研阶段 工程造价 重点项目 综合分析 pre-feasibility study stage engineering cost key projects comprehensive analysis
  • 相关文献

参考文献6

二级参考文献15

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部