期刊文献+

大直径盾构管片水平拼装试验方法探究 被引量:3

Investigating Test Method for Horizontal Assembly of Large-diameter Shield Segments
下载PDF
导出
摘要 大直径盾构管片水平拼装试验存在效率低下甚至失败的情况,不能真实全面反映产品尺寸精度。分析其原因除大直径管片体积大、重量大的因素外,主要原因在于现有的试验设备工装简陋、试验方法粗放、规范要求低等。结合当前水平拼装的规范要求,分析现有试验方法存在的不足,对现有拼装设备工装进行改造,制定高标准的、更加严格的工艺措施,创造性地提出在每层管片拼装时增加标高检测的新思路。将新方法应用于南京长江第五大桥夹江隧道工程管片水平拼装试验,结果良好,证明了此试验方法的科学性与有效性。 There's a presence of low efficiency and failure in horizontal assembly of large-diameter shield segments,which can’t precisely reflect dimensional accuracy.It may be on account of factors such as the large volume and heavy weight of the shield segments,while the main reason lies in the current rough equipment,crude testing methods as well as low norms and requirements.Therefore,it is essential to modify the assembly equipment,analyze the current norms and requirements of the horizontal assembly,put forward new and more severe requests,analyze the shortcomings of the test methods and improve them,furthermore creatively proposing the elevation detection in every assembly of the shield segment.TTie successful application of the new method to the horizontal assembly testing of shield segments in Jiajiang Tunnel Project of Nanjing No.5 Yangtze River Bridge verifies its scientific nature and validity.
作者 吴朱茂 WU Zhumao(China Railway 14th Bureau Group Fangshan Bridge Co.Ltd.,Beijing 102400,China)
出处 《铁道建筑技术》 2020年第4期35-39,共5页 Railway Construction Technology
基金 中国铁建股份有限公司科研计划课题合同(2018-B05)。
关键词 大直径盾构管片 水平拼装 支撑底座 楔形量 标高检测 large-diameter shield segment horizontal assembly supporting base wedge shape elevation detection
  • 相关文献

参考文献7

二级参考文献51

共引文献61

同被引文献18

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部