摘要 项目为建筑面积7.9万平的地下三层房建基坑,既有运营的地铁线从基坑西北角斜穿到东南角,施工期间确保地铁线运营安全整个项目的成败关键所在。基坑西北角地质条件差,地铁隧道上部为位于粘土层,底部为砂质粘性土,极易受到施工干扰,所以项目施工风险极大。项目采用静压钢板桩及低压注浆对隧道周进行加固,选用全套管全回转钻钻机成桩,确保了地铁既有线的安全。 The project is to build a foundation pit for an underground three-storey building with a construction area of 79,000 square meters. The existing subway line runs diagonally from the northwest corner of the foundation pit to the southeast corner. The key to the success of the entire project is to ensure the safety of the subway line during construction. The geological conditions of the northwest corner of the foundation pit are poor. The upper part of the subway tunnel is located in the clay layer and the bottom is sandy cohesive soil, which is extremely susceptible to construction interference, so the project construction risk is extremely high. The project uses static pressure steel sheet piles and low-pressure grouting to reinforce the periphery of the tunnel, and uses full-sleeve full-rotation drilling rigs to form piles to ensure the safety of the existing subway line.
作者 赵胜冬 ZHAO Sheng-dong(China Railway First Group Co.,Ltd.,Xi'an 710000,China)
出处 《价值工程》 2020年第14期187-189,共3页 Value Engineering
关键词 地铁既有线保护 静压钢板桩及低压注浆(软弱地层) 全套管全回转钻机桩基施工 subway existing line protection static pressure steel sheet pile and low pressure grouting(weak stratum) pile foundation construction with full casing and full rotary drilling rig
  • 相关文献

参考文献5

二级参考文献32

共引文献51

同被引文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部