摘要
针对传统校园地下管线及构筑物物探成果数据模型中存在的建模时间长,影响后续施工效率的问题,开展对校园地下管线及构筑物物探成果数据BIM建模方法的研究。通过对数据属性信息设置、BIM建模参数选择,实现对各个构件三维模型的开发。通过对比实验证明,该模型与传统模型相比有效降低了建模时间,更加满足建设施工对建模效率的需要。
Aiming at the problems that the modeling time in the traditional campus underground pipeline and structure geophysical prospecting data model is long and affects the subsequent construction efficiency,the re⁃search on the campus underground pipeline and structure geophysical prospecting data BIM modeling method is carried out.Through the setting of data attribute information and the selection of BIM modeling parameters,the development of the three-dimensional model of each component is realized.The comparison experiment proves that the model effectively reduces the modeling time compared with the traditional model and meets the needs of modeling efficiency for construction.
作者
山锋
丑洋
SHAN Feng;CHOU Yang(Logistics Division,Shaanxi College Of Communication Technology,Xi'an Shaanxi 710018,China)
出处
《粘接》
CAS
2020年第5期112-114,共3页
Adhesion
基金
陕西交通职业技术学院2018年度校级科研项目(YJ18004)。
关键词
地下管线
构筑物
物探成果
数据
BIM
建模
underground pipelines
structures
geophysical prospecting results
data
BIM
modeling